Drilling for bedrock level is in progress:
This drill was set up on the north side of Lincoln Highway at Diamond Street yesterday.
The foundation of the DePetris buildings needs to be set on bedrock.
Sign on Lipkin Building, Coatesville, PA (07/12/2015)
|
ALSO SEE:
No comments:
Post a Comment
You can add your voice to this blog by posting a comment.